Recently, during the matching drilling operation between the drum and main shaft of the 1.85×4 multi-rope friction mine hoist, Yu Le, team leader of the Assembly Team of the Heavy Complete Equipment Workshop, led Sun Xuefeng and Zhao Tongkang to carry out drilling work inside the drum. Faced with challenges such as narrow working space inside the drum and inconvenient operation, the three overcame difficulties and successfully completed the drilling procedure.
